image
Imageimage ImageImageImageImage
Introduction Supporting Organisations Spectrum Of Services Organisational Chart Projects In India What our Clients Say Projects Abroad Major Fields Of Specialisation

What Our Clients Say

  • THE PEOPLE’S DEMOCRATIC REPUBLIC OF ETHOPIA
    Water Resources Development Authority

    WRDA is satisfied with the diligent performance of the WAPCOS team and feels that the stipulations of the agreement between WAPCOS and WRDA have been faithfully complied by the team.
  • PANCHESHWAR CONSORTIUM
    Kathmandu, Nepal

    WAPCOS is to be commended for its performance on the rock mechanics subcontract work. PACO is pleased that you completed your assignment on time, within budget and produced a high quality report.

  • THE WORLD BANK
    International Bank for Reconstruction and Development
    International Development Association
    Subernarekha Irrigation Project (Orissa)

    We have thoroughly reviewed the above feasibility studies prepared by your organization and found them excellent in all respects for the appraisal of the Subarnarekha Irrigation Project. The feasibility report has reached an exceptional standard of quality.

  • GOVERNMENT OF ZIMBABWE
    Ministry of Transport and Energy

    We would like to take this opportunity to thank WAPCOS for the thorough assignment you carried out. We are very grateful and we will be contacting you if a similar assignment may arise.

  • CHUKHA HYDRO POWER CORPORATION
    (A Royal Govt. of Bhutan Undertaking)

    I have great pleasure in informing you that the consultancy services by M/s WAPCOS (I) Ltd. has been of very high standard. The cooperation and timely assistance rendered by WAPCOS in meeting the time-bound project schedule has been exemplary.

  • HIS MAJESTY’S GOVERNMENT OF NEPAL
    Ministry of Water Resources

    I am happy to see the presentation of Final Report by WAPCOS. The report is excellent and compares very well with any International Standard.

  • THE PEOPLE’S DEMOCRATIC REPUBLIC OF ETHIOPIA
    Ethiopian valleys Development Studies Authority

    Ethiopian Valleys Development Studies Authority seizes this opportunity to extend its sincere gratitude to WAPCOS and its experts who diligently carried out their assignment very professionally.

  • TALA HYDROELECTRIC PROJECT AUTHORITY
    Government of Bhutan

    I take this opportunity to inform you that the Tala Power House road has been made motorable in it’s entire length. On this happy occassion I take this opportunity to convey my appreciation for the contribution made by the WAPCOS towards achievement of this important milestone.

  • THE GOVERNMENT OF THE UNION OF BURMA
    Myanmar Electric Power Enterprise

    WAPCOS Experts have demonstrated a high level technical competence in the execution of the works assigned under the terms of reference of the consultancy contract.

  • MINISTRY OF IRRIGATION
    General Directorate of Orontes Basin, Syria

    WAPCOS had completed the design review to the entire satisfaction of the General Directorate for Irrigation, HAMA and design review is technically of good standard.

  • TALA HYDROELECTRIC PROJECT AUTHORITY
    Government of Bhutan

    I am thrilled to learn that Power House drift of the Tala Hydroelectric Project has just been completed in it’s full length of more than 700 m by a throughly dedicated field unit of WAPCOS. Tala management team joins me to wish WAPCOS all round success in it’s activities in Tala Project and elsewhere.

  • NATIONAL CAPITAL REGION PLANNING BOARD, INDIA

    It is my pleasure to acknowledge the receipt of the final report on the above study entrusted to WAPCOS and express my thanks for the excellent comprehensive studies conducted by the engineers and consultants of WAPCOS.

  • POWER DEPARTMENT
    Government of Sikkim, Gangtok

    We acknowledge with thanks the receipt of 15 copies of Detailed Project Report for Transmission System associated with Rathongchu Hydro-electric Project. In this respect I take this opportunity to congratulate you for the marvellous job done by your organisation in presenting a self-contained and condensed form of Report.

  • GOVERNMENT OF ORISSA
    Simulation Studies and Real Time Operation for Subernarekha Multipurpose Project
    (World Bank Assisted Project)

    The demonstration of Real Time Operation Model was fully saatisfactory and it is felt that the model will be of great use in the operation of Subernarekha Multi-Purpose Irrigation Project. The model is preciously done and I feel happy to appreciate and congratulate all the members who have taken part in this project.

  • MINISTRY OF HEALTH & FAMILY WELFARE, INDIA

    M/s WAPCOS was awarded the job of development of software for Financial Management System based on Loan Administrative Change Initiative (LACI) of the World Bank. The job has been completed satisfactorily. The whole team was very cordial and cooperative.

  • INTERNATIONAL IRRIGATION MANAGEMENT INSTITUTE (IIMI), SRI LANKA

    WAPCOS’s activities in the developing countries to provide consultancy services in the water and power sectors have received tremendous admiration and support.

  • MINISTRY OF IRRIGATION
    General Directorate of Orontes Basin, Syria

    WAPCOS had completed the design review to the entire satisfaction of the General Directorate for Irrigation, HAMA and design review is technically of good standard.

  • TALA HYDROELECTRIC PROJECT AUTHORITY
    Government of Bhutan

    I am thrilled to learn that Power House drift of the Tala Hydroelectric Project has just been completed in it’s full length of more than 700 m by a throughly dedicated field unit of WAPCOS. Tala management team joins me to wish WAPCOS all round success in it’s activities in Tala Project and elsewhere.

  • NATIONAL CAPITAL REGION PLANNING BOARD, INDIA

    It is my pleasure to acknowledge the receipt of the final report on the above study entrusted to WAPCOS and express my thanks for the excellent comprehensive studies conducted by the engineers and consultants of WAPCOS.

  • POWER DEPARTMENT
    Government of Sikkim, Gangtok

    We acknowledge with thanks the receipt of 15 copies of Detailed Project Report for Transmission System associated with Rathongchu Hydro-electric Project. In this respect I take this opportunity to congratulate you for the marvellous job done by your organisation in presenting a self-contained and condensed form of Report.

  • GOVERNMENT OF ORISSA
    Simulation Studies and Real Time Operation for Subernarekha Multipurpose Project
    (World Bank Assisted Project)

    The demonstration of Real Time Operation Model was fully saatisfactory and it is felt that the model will be of great use in the operation of Subernarekha Multi-Purpose Irrigation Project. The model is preciously done and I feel happy to appreciate and congratulate all the members who have taken part in this project.

  • MINISTRY OF HEALTH & FAMILY WELFARE, INDIA

    M/s WAPCOS was awarded the job of development of software for Financial Management System based on Loan Administrative Change Initiative (LACI) of the World Bank. The job has been completed satisfactorily. The whole team was very cordial and cooperative.

  • INTERNATIONAL IRRIGATION MANAGEMENT INSTITUTE (IIMI), SRI LANKA

    WAPCOS’s activities in the developing countries to provide consultancy services in the water and power sectors have received tremendous admiration and support.
Top