| CENTRE FOR POWER |
| |
TYPE
|
CAPACITY
(MW) |
Surveys
&
Investigations
|
Pre-Feasibility
/ Feasibility
Studies
/ Preparation
of
DPR |
Construction
Supervision
|
Engineering
Design,
Construction
Drawing
&
Cost Estimates
|
Construction
Manag.
|
Financial
Manag.
/ Special Studies
|
| AFGHANISTAN |
| i) Salma Dam Project |
Hydro |
2x20 |
|
* |
* |
* |
|
|
| ii) Khanabad Hydro
Electric Project |
Hydro |
2x20 |
|
* |
* |
* |
|
|
| iii) Kajakai Power
Project |
Hydro |
3X33.3+1x18.5 |
* |
* |
|
|
|
|
| iv) Kajakai - Kabul
220 KV Project |
Hydro |
3X33.3+1x18.5 |
* |
* |
|
|
|
|
| v) Kajakai - Herat
220 KV Project |
Transmission Lines |
|
* |
|
|
|
|
* |
| vi) Salma - Herat
110 KV Project |
Transmission Lines |
|
* |
|
|
|
|
* |
| vii) Micro-Hydel Schemes
- Ministry of Water & Power |
Transmission Lines |
|
* |
|
|
|
|
* |
| |
| ARMENIA |
| i) Power Maintenance
Project |
- |
- |
- |
- |
- |
- |
- |
- |
| |
| BHUTAN |
| i) Chukha Hydro Electric
Project |
Hydro |
4X84 |
|
|
* |
|
* |
|
| ii) Tala Hydro Electric
Project |
Hydro |
6X170 |
* |
* |
* |
* |
* |
|
| iii) Kurihu Hydro
Electric Project |
Hydro |
6X170 |
* |
* |
* |
* |
* |
|
| iv) Wangchu Hydro
Electric Project |
Hydro |
4X225 |
* |
* |
|
|
|
|
| v) Bunakha Hydro Electric
Project |
Transmission Lines
|
|
|
|
* |
* |
* |
|
| vi) Chukha - Birpara
220 KV DC & 200 KV SC Project |
Transmission Lines
|
|
|
|
* |
* |
|
|
| vii) Chukha - Birpara
66 KV SC Project |
Transmission Lines
|
|
|
|
* |
* |
* |
|
| viii) Thimpu - Paro
- Pasakha - Phuentsholing 4 Nos. 66 KV Project |
Transmission Lines
|
|
|
|
* |
* |
* |
|
| ix) 400 KV Evaluation
Arrangement for Tala Hydro Electric Project |
Transmission Lines
|
|
|
|
* |
* |
* |
|
| x) Development of
132 KV Transmission Grid for Kurichu Project |
Transmission Lines |
|
|
|
* |
* |
* |
|
| xi) Micro -Hydel Schemes |
Hydro Power |
|
|
|
|
|
|
|
| xii) 132KV Transmission
Grid in Eastern Bhutan |
Transmission of Power |
|
|
|
|
|
|
|
| xiii) Sub-Transmission
and Distribution for Thimpu & Paro |
|
|
|
|
|
|
|
|
| xiv) Improvement and
Upgradation of Transmission System in Western Bhutan |
|
|
|
|
|
|
|
|
| xv) Electrification
of Gedu Town |
|
|
|
|
|
|
|
|
| |
| FIJI
ISLANDS |
| i) Micro -Hydel Project
- Govt. of Fiji |
Hydro Power
|
|
|
|
|
|
|
|
| |
| INDONESIA |
| i) Batang Hari Hydro
Electric Project |
Hydro Power
|
|
|
|
|
|
|
|
| |
| IRAQ
(Before War) |
| i) Bakuman Dam Project
- Ministry of Agriculture & Irrigation
|
Hydro Power |
|
|
|
|
|
|
|
| ii) Khalikan Dam Project
- Ministry of Agriculture & Irrigation |
Hydro Power |
|
|
|
|
|
|
|
| |
| MALAYSIA |
| i) Sungai - Piah Hydro
Electric Project |
Hydro |
7x3 |
|
|
|
|
|
|
| Pasir Gudang Thermal
Power Station |
Thermal Power |
|
|
|
|
* |
|
|
| Port Kiang Power Station |
Thermal Power |
|
|
|
|
* |
|
|
| |
| MYANMAR |
| i) Sedawgyi Hydro
Power Project |
Hydro |
|
|
|
|
|
|
|
| ii) Mini Hydro Project
- Electric Power Corporation |
Hydro Power
|
2x12.5
|
|
|
*
|
*
|
*
|
|
| iii) Rural Mini Hydro
Power Projects |
Hydro Power |
|
|
|
|
|
|
|
| |
| NEPAL |
| i) Trisuli Hydel Project |
Hydro |
3x7 |
* |
|
*
|
*
|
*
|
|
| ii) Devigat Hydel
Project |
Hydro |
3x4.7 Mini Hydel |
* |
|
|
|
|
|
| iii) Pancheswar Multipurpose
Project |
Multipurpose |
8x350 |
* |
|
|
|
|
* |
| iv) Karnali Multipurpose
Project |
Hydro |
18x600 |
* |
|
|
|
|
* |
| |
| PHILIPPINES |
| i) Mindoro & Palawan
Mini Hydro Projects |
Hydro
|
Mini Hydel
|
|
|
|
*
|
|
|
| |
| SOLOMON
ISLANDS |
| i) Haimatua Mini Hydro
Projects |
Hydro |
Mini Hydel |
|
|
|
|
|
|
| ii) Mini Hydro Projects
- Govt. of Solomon Islands |
Hydro Power |
|
|
|
|
* |
*
|
|
| |
| SRI
LANKA |
| i) Kotamale Hydro
Electric Project |
Hydro |
3x50 |
|
* |
* |
* |
|
|
| |
| SULTANATE
OF OMAN |
| i) Ancab Rockfill
Dam Project - Ministry of Agriculture & Fisheries |
Hydro Power |
|
|
|
|
|
|
|
| ii) Muscat Concrete
Dam Project - Director General of Technical Affairs |
Hydro Power |
|
|
|
|
|
|
|
| |
| ZIMBABWE |
| i) Rural Electrification
Master Plan Study |
Rural Electrification |
|
|
|
|
|
|
|
| ii) Hwange Thermal
Power Project |
Thermal Power |
- |
- |
- |
- |
- |
* |
- |
| iii) Operation and
Maintenance of Power stations-Electricity Supply Authority , Govt.
of Zimbabwe |
Thermal Power |
4X120+2X220 |
|
|
|
|
* |
* |