image
Imageimage ImageImageImageImage
Introduction Supporting Organisations Spectrum Of Services Organisational Chart Projects In India What our Clients Say Projects Abroad Major Fields Of Specialisation

Projects In India


CENTRE FOR PORTS, HARBOURS AND INLAND WATERWAYS
  Surveys & Investigations Pre-Feasibility/ Feasibility Studies/ Planning Studies Engineering Design, Construction Drawing & Cost Estimates Technical Specifications, Tender Documents, Contract Management Construction Supervision/ Quality Control Training/ Services of Personnel Technical Assistance/ Advisory Services/ Review & Appraisal
ANDHRA PRADESH
i) Feasibility Study and Assistance in Preparation of BOST Bid for Development of Port at Gangavaram   *          
ii) Feasibility Studies for Jetty and External Coal Handling System for 2x 250 MW Coal fired Power Station at Krishnapatnam * *          
iii) BOST Project for Development of a Deep Water Port at Gangavaram   * *        
iv) Feasibility study and Assistance in Preparation of BOST Bid for Development of Port at Gangavaram for M/s Amma Lines Ltd.              
 
ASSAM
i) Inland Waterways Transport Study on River Brahmaputra * * *        
 
ANDAMAN & NICOBAR ISLANDS
i) Feasibility for setting up 300 t.p.d. Pulp Plant based on Andaman Timber * *          
ii) Development of Fresh Water lake at Port Blair * *          
 
GUJARAT
i) Silitation Studies for Essar's proposed Deep Water Harbour at outer Hazira   *          
ii) Pre-feasibility Study for Development of Port at Maroli              
iii) Studies for Expansion of Berthing Facilities at Muldwarka   * *        
iv) Studies and Design for Extension of ESSAR Jetty at Hazira   * *        
v) Development of Port Facilities for Loading of Bulk Cement at Muldwarka * * * * *    
vi) Site Selection and Development of Port Facilities for Handling of Bulk Cement at Magda * * * * * *  
vii) Studies for Dredging of Turning Basin and Disposal of              
viii) Dredged Spoil in River Tapi at Hazira * * * * * *  
ix) Design and Construction Supervision of Breakwater and Deepwater Berth at Muldwarka * * *        
x) BOOT Project for Development Plan for All Weather * * *        
xii) Rehabilitation of Damaged Breakwater at Porbander Development of Port Facilities at Chhara              
xiii) Development of Port Facilities at Chhara   * * * *    
xiv) Design and Construction Supervision of Breakwater * *          
xv) and Deepwater Berth at Muldwarka for M/s Gujarat Ambuja Cements Ltd.     *        
xvi) Setting up all weather Port in Gujarat for Natelco LPG Jetty at Okha              
xvii) Intake water Studies for CPP & HSH at Amba Creek              
xviii) Planning & Design of Cement cum General Cargo Jetty at Thangaserry              
xix) Development of Port facilities at Munambam              
xx) Multipurpose Port & Dry Dock near Aware village              
xxi) Construction of Beyt Dwarka Jetty Bandh              
xxii) Restoration of Breakwater at Port Veraval              
xxiii) EIA study for LNG Terminal at Dahej              
xxiv) Supervision of Geo-Technical works for Nhava Shava              
xxv) International container Terminal for Cullen Grummit Roe-Australia              
 
GOA
i) Inland Waterways Transport Study on River Brahmaputra   *          
 
KARNATAKA
i) Material Handling Study for Transport of 200,000 t.p.a. Salt for Caustic Plant at Karwar   *          
ii) Oceanographic Studies at New Mangalore Port for Ws Rachiyo Engineering Company, Tokyo, Japan *         *  
 
KERALA
i) Studies for Development of Cement Unloading Facilities at Thangaserry on Kerala Coast *   * * *    
ii) Design Jetty at Munambam              
iii) Kakadavu Project * * * * *    
iv) Lock Design at W.C.C. Kerala              
 
MAHARASHTRA
i) Model Studies for the Facilities at Mirya Bay (Rathnagiri)   *          
ii) Proof Consultancy for Construction of Jetty Design for M/s Dabhol Power Corporation     *        
iii) Conceptual Plan for Development of JNPT   *          
iv) Detailed Engineering for Captive Cement Terminal at Vasai a Creek * * * * * *  
v) Design of Cooling Water System for Captive Plant at Dolvi (Raigarh) * * * * * *  
vi) Development of fishing Harbour at Harnai and Sakhrinate              
vii) Study for Development of Inland Water Transport around Mumbai              
 
ORISSA
i) Hydraulic Model Studies for New Iron Ore Berth, Paradip Port * *         *
ii) Techno-Economic Feasibility Study for Navigation in East Coast Canal from Calcutta to Paradip * *          
iii) DPR for East Coast Canal              
 
WEST BENGAL
i) Detailed Engineering for Shore Protection Works and Site Supervision at Balagarh Char   * * * *    
ii) Dredging of Haldia dock by CSD Aquarius * *          
iii) Desk Studies on location of Pumped Intake of Budge-Budge Thermal Power Station * *          
iv) Miscellaneous Studies for Intake Jetty Design at Balagarh Char * *          
v) Techno-economic Feasibility Study for Development of Navigation on Damodar-Valley Corporation Canal * *         *
vi) Manpower Consultancy Services for Management of River Conservancy Works on NW I & II              
 
DAMAN
i) Design of Protection Wall against sea-erosion * * *        
ii) Extension of existing Jetty in Nani & Daman * * *        
Top