| Sl. No. |
Subject |
Date of Issue |
Date of Submission |
1 |
Notice Inviting Tender for “Conducting Topographical surveys for 2000 MW Thermal Power Plant, at Tori ,Jharkhand.
Download NIQ
|
30/07/2010 |
12/08/2010 |
2 |
Notice Inviting Quotation for “Conducting Geo-Technical Investigations for 2000 MW Thermal Power Plant , at Tori, Jharkhand “
Download NIQ
|
30/07/2010 |
12/08/2010 |
3 |
Notice Inviting Quotation for “Measurement of flow parameters like Velocity, Discharge, Flow depth and Energy losses in various components of Power House units” for 3 x 5 MW Eastern Gandak Canal HE Project, Valmikinagar, Distt. West Champaran, Bihar.
Download NIQ
|
23/07/2010 |
09/08/2010 |
4 |
Notice Inviting for Preparation of Base Maps, Conducting Topographical Surveys for 1100 Unsewered Areas and Integration of Data in GIS for The Delhi Area for Master Planning of Sewerage System
Download NIQ
Annex-1
Annex-2
Annex-3 |
21/06/2010 |
05/07/2010 |
5 |
Notice Inviting for Geotechnical Investigation for Detailed Project Report for Alternate Route for Baratang Island (A & N Islands)
Download NIQ |
17/06/2010 |
28/06/2010 |
6 |
Notice Inviting for Hydrographic Topographic and Hydraulic Survey for for Detailed Project Report for Alternate Route for Baratang Island (A & N Islands)
Download NIQ |
17/06/2010 |
28/06/2010 |
6 |
Notice Inviting Bid for Short listing of agencies for digitization work
Download NIQ |
07/06/2010 |
25/06/2010 |
7 |
Notice Inviting Bid for the Comprehensive Annual Maintenance Contract (AMC) of Computer & Peripherals for the year 2010-2011.
Download NIQ
Corrigendum1 : "Last date has been extended upto16.06.2010 and it is added that the facility management should also be essential, rest all terms & conditions remain unchanged"
Corrigendum2 : "Last date has been extended upto 25.06.2010 and details are as follows"
Download Details |
13/05/2010 |
25/06/2010 |
8 |
Notice inviting quotation for Topographical Survey for Consultancy Service Package for Water Study for Orissa Ultra Mega Power Project (UMPP), District Sundargarh”.
Download NIQ
Corrigendum 1: “clause 4.4 part –pertaining to “Part –I Qualifying and Technical requirement”-complete form of Quotation-Annexure-I may be read as the part of the “Part-II Bid price
Corrigendum 2 : "Last date has been extended upto 27.05.2010 and all terms & conditions remain unchanged" |
06/05/2010 |
27/05/2010 |
9 |
Notice inviting quotation for Geo-Technical Survey for Consultancy Service Package for Water Study for Orissa Ultra Mega Power Project (UMPP), District Sundargarh”.
Download NIQ
Corrigendum 1: “clause 4.4 part –pertaining to “Part –I Qualifying and Technical requirement”-complete form of Quotation-Annexure-I may be read as the part of the “Part-II Bid price
Corrigendum 2 : "Last date has been extended upto 27.05.2010 and all terms & conditions remain unchanged"
Corrigendum 3 : "Last date has been extended upto 04.06.2010 and all terms & conditions remain unchanged" |
06/05/2010 |
04/06/2010 |
10 |
Quotation for providing Comprehensive office upkeep & Maintenance Services on yearly basis
Download tender form
Download tender notice |
29/04/2010 |
17/05/2010 |
11 |
Tender for supply, delivery and demonstration of Spectra make EPOCH 10 L1 Frequency GPS System
Download NIQ
ANNEXURE-1 |
22/04/2010 |
29/04/2010 |
12 |
Notice Inviting Quotation for "Supply and Installation of Ebook Reader"
Download NIQ
|
20/04/2010 |
30/04/2010 |
13 |
Notice Inviting Quotation for Geological and Geotechnical Investigation works for “Irrigation Studies of Command Area in Indian Territory through Sapta Kosi High Dam Multipurpose Project and Sun Kosi Storage Diversion Scheme”
Download RFP
Corrigendum 1: Last date has been extended upto 29.3.10
Corrigendum 2: Last date has been extended upto 9.4.10 |
27/02/2010 |
9/04/2010 |
14 |
Notice Inviting Quotation for Semi-detailed soil Survey and Soil Mapping for the project “Irrigation Studies of Command Area in Indian Territory through Sapta Kosi High Dam Multipurpose Project and Sun Kosi Storage Diversion Scheme”.
Download RFP
Corrigendum 1: Last date has been extended upto 29.3.10
Corrigendum 2: Last date has been extended upto 9.4.10 |
27/02/2010 |
9/04/2010 |
15 |
NOTICE INVITING HYDRAULIC SURVEYS AND WIND MEASUREMENT FOR DEVELOPMENT OF ALL WEATHER DEEP DRAFTED GREENFIELD SEAPORT AT HALDIPUR KARNATAKA
Download RFP |
18/02/2010 |
25/02/2010 |
16 |
Notice inviting quotation for conducting topographical surveys for Teesta Low Dam-(I&II) combined and Teesta Intermediate Hydroelectric Projects in West Bengal.
Download NIQ
Download MAP |
12/02/2010 |
26/02/2010 |
17 |
Notice for Geo-Technical Investigations(Marine) for Development of all weather deep drafted greenfield seaport at Haldipur, Karnataka
Download NIQ |
04/02/2010 |
11/02/2010 |
18 |
Notice for Selection of a Systems Integrator(SI) for Implementing ERP System on Turnkey Basis
Tender Stands Cancelled
Download RFP
Download FinanceProcedureFlows.pdf
Download ISOProcedureFlow.pdf
Download QualityProcedureFlow.pdf
Download BO-ProcedureFlows.pdf
Download HRProcedureFlows.doc.pdf
Download ProjectManagementProcedure.pdf
Corrigendum 1: Last date has been extended upto 19.3.2010 upto 2.30 pm and technical bid will be opened on the same day at 3.00 pm..
Corrigendum 2: Last date has been extended upto 05.04.2010 upto 2.30 pm and technical bid will be opened on the same day at 3.00 pm..
Download Corrigendum 2
The bidders are now required to quote the rate for warranty period of one year as a seperate item.
Download Corrigendum 3
The last date is extended upto 27.4.10. This file carries the clarifications for the bidders . |
30/01/2010 |
Cancelled |
19 |
Notice Invites for Sale of unserviceable/unwanted/condemned items.
Download NIQ |
20/01/2010 |
27/01/2010 |
20 |
Notice Invites for 3rd party inspection and testing of the weldings of joints of penstock ferrules
Download NIQ |
18/01/2010 |
28/01/2010 |
21 |
Notice inviting Bid for Disposal of Vehicles.
Download NIQ |
08.01.2010 |
25.01.2010 |
22 |
Notice Inviting for Topographic, Hydrographic & Hydraulic Survey and Wind measurement for proposed green field seaport at HALDIPUR Karnataka.
Download NIQ |
01/01/2010 |
14/01/2010 |
23 |
Notice Invites from Indian Bidders for Geo-technical Investigations (MARINE) at HALDIPUR Karnataka.
****** Stands Cancelled*****
Download NIQ |
01/01/2010 |
14/01/2010 |
24 |
NOTICE INVITING FOR HIRING OF TECHNICAL ORGANISATION FOR PROVIDING THE SERVICES OF LOCAL EXPERTS IN LAO PDR
Download NIQ |
01/01/2010 |
15/01/2010 |
25 |
Notice inviting quotation for “Topographical Survey” for the consultancy project on “Area Drainage & Hydrologic Studies” for the proposed thermal power station at Sompeta in Srikakulam district in Andhra Pradesh.
Download NIQ |
20/11/2009 |
04/12/2009 |
26 |
Notice inviting quotation for geotechnical investigation work for the project “DPR preparation for Sher Machhrewa Shakkar Complex Project” in Narsinghpur district of Madhya Pradesh.
Download NIQ
Corrigendum : Last date has been extended upto 20th Nov. 2009 |
30/10/2009 |
20/11/2009 |
27 |
Notice Inviting quotations for Topographical Surveys work and Geo-Technical Investigation work for preparation of detailed project report for Lower Vansadhara Project, Orissa
Topographical Survey
Geotechnical Investigation Corrigendum : Last date has been extended upto 16th Nov. 2009 |
29/10/2009 |
|
|
Notice Inviting for Redesing and Development of WAPCOS Website
Download NIQ |
06/10/2009 |
|
|
Notice Inviting Quotation for Baseline Survey for the Nagarjuna Sagar Project in Andhra Pradesh.
Download NIQ |
30/09/2009 |
|
|
Notice Inviting Quotation for Topographical and Alignment Survey for “Irrigation Studies of Command Area in Indian Territory through Sapta Kosi High Dam Multipurpose Project and Sun Kosi Storage Diversion Scheme”.
Download NIQ
Corrigendum -1: Last date has been extended upto 30th Oct. 2009
Corrigendum -2 : Last date has been extended upto 27th Nov. 2009 |
06/09/2009 |
|
|
Conducting Geo-Technical Investigations of Pipeline Route Of Agra Canal & Yamuna River From Okhla Barrage To Proposed Pump House Nearly 2.2 Km Apart From Intake Point
Download NIQ
Corrigendum : Last date has been extended upto 5th Oct. 2009 |
03/09/2009 |
|
|
Notice inviting quotation for Topographical Survey for 2X600 MW Suratgarh Super Thermal Power Project, Suratgarh, Distt. Ganganager
Download NIQ
|
28/08/2009 |
|
|
Quotation for Purchase of Computers for 3rd Party REC Uttarakhand Project
Download NIQ
|
13/08/2009 |
|
|
Quotation for Empanelment of Computer Stationery for the year 2009-2010.
Download NIQ
List of Computer Sationery Items
Corrigendum : Last date has been extended upto 27 July. 2009 |
13/07/2009 |
|
.